| Specification Category | Technical Specifications |
|---|---|
| Compatible Applications | JCB Equipment (Compatible with 25-220804, 25-220990, 459-M2874 applications) |
| COGENG Part Number | CG-JCB-SV-35 |
| Replaces OEM Part Numbers | 25-220804, 25-220990, 459-M2874 |
| Product Type | Electro-Hydraulic Solenoid Valve |
| Operating Voltage | 12V/24V DC |
| Maximum Pressure | 350 Bar (5,000 PSI) |
| Fluid Compatibility | Mineral-based, synthetic, and bio-degradable hydraulic oils |
| Temperature Range | -40°C to 120°C |
| Protection Rating | IP67 Sealed Connectors |
| Quality Assurance | 100% Pressure and Performance Tested |
| Warranty | COGENG 12-Month Warranty |

| NO | Number | Name | Qty |
| 1 | 11E9-4601 | Bracket | 1 |
| 2 | 11E9-4605 | Bracket Wa | 1 |
| 4 | 11E6-4506 | Cable-Push Pull | 1 |
| 6 | 11E6-4505 | Lever | 1 |
| 7 | E111-4504 | End-Rod | 2 |
| E111-4504 | End-Rod | 1 | |
| 8 | S015-060252 | Bolt-Hex | 2 |
| 9 | S015-060352 | Bolt-Hex | 2 |
| 11 | S017-100502 | Bolt-Hex | 4 |
| 12 | S017-100202 | Bolt-Hex | 3 |
| 13 | S411-060002 | Washer-Spring | 4 |
| 15 | S411-100002 | Washer-Spnng | 8 |
| 16 | S201-061002 | Nut-Hex | 4 |
| S201-061002 | Nut-Hex | 2 | |
| 17 | 11E9-4604 | Lever Assy | 1 |
| 18 | S471-500204 | Pin-Spring | 1 |
| 19 | 11E9-4603 | Throttle Motor | 1 |
| 11E9-46071 | Throttle Motor | 1 | |
| 11E9-46072 | Throttle Motor | 1 | |
| 11E9-62010 | Throttle Motor | 1 | |
| 19-1 | 21E9-30010 | .Potentiometer | 1 |
| 20 | S017-100402 | Bolt-Hex | 1 |
| 21 | S205-101002 | Nut-Hex | 1 |
| 22 | 11EM-60030 | End-Rod | 2 |
| 23 | S205-081002 | Nut-Hex | 2 |
System Pressure Relief: Completely relieve all hydraulic system pressure before beginning installation
Hydraulic Line Documentation: Mark and photograph all hydraulic line connections for proper reassembly
Electrical Connection Safety: Disconnect battery and main power sources before handling electrical connections
Port Protection: Immediately cap all open hydraulic ports to prevent contamination
Seal Inspection: Verify all seals are properly installed and lubricated before connection
System Bleeding: Properly bleed hydraulic system after installation to remove air
Operational Testing: Test valve function through complete operational cycle before returning to service
